Application Planning; Transport; Unpacking And Checking The Delivery Unit - Siemens SIMATIC Rack PC 840 V2 Getting Started

Pentium 4 platform
Hide thumbs Also See for SIMATIC Rack PC 840 V2:
Table of Contents

Advertisement

Application planning

3.1

Transport

Despite the fact that the Rack PC is of rugged design, its internal components are sensitive
to severe vibrations or shock. You must therefore protect the PC from severe mechanical
stress when transporting it.
You should alays use the original packaging for shipment of the device.
Caution
Risk of damage to the device!
When transporting the PC in cold weather it may be submitted to extreme variations in
temperature. In this situation, should make sure that dewing does not develop on or inside
the device.
If dewing has developed, wait at least about 12 hours before you switch on the device.
3.2

Unpacking and checking the delivery unit

Unpacking the device
Note the following points when you unpack the unit
• It is advisable not to dispose of the original packing material. Keep it in case you have to
• Please keep the documentation in a safe place. It is required for initial commissioning and
• Check the delivery unit for any visible transport damage.
• Verify that the shipment contains the complete unit and your separately ordered
SIMATIC Rack PC 840 V2
Getting Started, Edition 04/2004, A5E00248069-02
transport the unit again.
is part of the device.
accessories. Please inform your local dealer of any disagreements or transport damages.
3
3-1

Advertisement

Table of Contents
loading

Table of Contents