ADInstruments AD-9962 Manual page 41

Table of Contents

Advertisement

Available languages

Available languages

_______________________________________________________________________________
BATTERY INSTALLATION
WARNING: To avoid electric shock, disconnect the test leads from any source of voltage
before removing the battery cover.
Do not operate the instrument with the battery cover removed
5. Disconnect the test leads from the meter.
6. Open the battery cover by loosening the screw using a Phillips head screwdriver.
7. Insert the battery into battery holder, observing the correct polarity.
8. Put the battery cover back in place. Secure with the two screws.
NOTE: If your meter does not work properly, check the fuses and battery to make sure that
they are still good and that they are properly inserted.
REPLACING THE FUSES
WARNING: To avoid electric shock, disconnect the test leads from any source of voltage
before removing the fuse /battery cover.
1. Disconnect the test leads from the meter and any item under test.
2. Open the fuse door by loosening the screw on the door using a Phillips head screwdriver.
3. Remove the old fuse from its holder by gently pulling it out.
4. Install the new fuse into the holder.
5. Always use a fuse of the proper size and value (0.5A/1000V fast blow for the 400mA range,
10A/1000V fast blow for the 10A range).
6. Put the fuse door back in place. Insert the screw and tighten it securely.
WARNING: To avoid electric shock, do not operate your meter until the fuse door is in place
and fastened securely.
©Copyright Abacanto Digital SA.
Manual de usuario AD-9962
AD Instruments
41

Advertisement

Table of Contents
loading

Table of Contents