REMKO HTL 400 Operation  Technology
REMKO HTL 400 Operation  Technology

REMKO HTL 400 Operation Technology

Oil-fired heating centers

Advertisement

Quick Links

REMKO HTL 400
Oil-fired Heating Centers
Operation · Technology
Edition GB – R11

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HTL 400 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for REMKO HTL 400

  • Page 1 REMKO HTL 400 Oil-fired Heating Centers Operation · Technology Edition GB – R11...
  • Page 3: Table Of Contents

    These instructions are a part of the device and must thus always be kept in the direct vicinity of the assembly site or on the device itself. Made by REMKO Subject to change; we do not accept liability for errors and typographical errors!
  • Page 4: Safety Instructions

    REMKO HTL 400 Safety Notices Description of Device When using the device, always observe the respective local construc- The device is directly fuelled with tion and fire protection ordinances as well as the regulations of EL heating oil or diesel fuel and the employers‘...
  • Page 5 Suitable locations for operating the device As a directly fuelled warm air gen- Dependent upon the heating The thermostat (TR) controls erator, the device provides requirement, the operation operation of the fan. immediate heat. described is repeated auto- It is exclusively used for commer- matically.
  • Page 6: Setting Up The Unit

    REMKO HTL 400 Setting up the device When setting up the device, the In the case of a soft surface, An adequate supply of air for ■ ■ requirements of local building appropriate substructures must combustion is provided when regulations and heating device be used such as e.g.
  • Page 7 Fuel supply Electrical connection Secure fastening of the tubes ■ and pipes at the connection An adequate fuel supply must be The electrical connection points must be observed ■ maintained on site using appropri- of the device must be ately approved safety tanks. performed at a dedicated To prevent heat accumulation, ■...
  • Page 8: Prior To Operation

    REMKO HTL 400 Prior to Operation Before commissioning, the device Air Diffusion With increased induction ■ should be checked for noticeable temperature or resistance at defects of the operating and safety The device is fitted with a special the device outlet, it is possible...
  • Page 9 Measuring nominal current Setting the thermal overload Excessive current and current consumption relay consumption Following installation of the air 1. In order to preclude errors in If the motor is using too much ducting on induction and air outlet measurement each phase current, despite correct electrical sides, the following checks should conductor and fan stage must...
  • Page 10: Initial Operation

    REMKO HTL 400 Commissioning Starting the device 2. Each phase can be checked for 3. Open all closures in the fuel correctness using the phase test supply. During initial Operation and monitoring of the selector switch. commissioning, air in the...
  • Page 11: Shutting Down The Unit

    Shutting Down the Unit Heating with a room 1. Turn the operating switch to thermostat (accessories) the „0“ position (off). The devices operate fully auto- matically depending on the room 2. Close off the temperature. fuel supply at the device and 1.
  • Page 12: Maintenance And Service

    REMKO HTL 400 Maintenance and Care The regular care and observance of Examine on site fuel containers Cleaning tasks ■ some basic prerequisites guarantee regularly for contamination or malfunction-free operation and a foreign bodies and clean them After every heating period or inde- long service life of the device.
  • Page 13 After all adjustment tasks the through the burner opening. doors must be closed. A special chamber cleaning set In order to prevent unautho- is available as an accessory to rized operation, the doors the REMKO industrial vacuum should also be locked. cleaner.
  • Page 14: Troubleshooting

    REMKO HTL 400 Troubleshooting 7. Prior to resetting the STB, make Forced air burner and IMPORTANT sure to analyse the causes and energy supply Before all work on the device, eradicate them. the mains plug must be remo- The following causes can be 1.
  • Page 15: Proper Use

    The devices must be exclusively into operation to REMKO GmbH & and supplied in stable cardboard serviced by appropriately trained Co KG. packaging on a wooden palette if staff.
  • Page 16: Wiring Diagram

    REMKO HTL 400 Wiring diagram ������������� We reserve the right to make changes in dimensions and design in the interest of technical advance.
  • Page 17 Wiring diagram When ordering spare parts, always list the EDP no. as well as the device no. and device type (see the type plate)!
  • Page 18: Maintenance Log

    REMKO HTL 400 ✍ Maintenance Log Device type: ........Device number: ........10 11 12 13 14 15 16 17 18 19 20 Clean unit – surface – Clean unit – inside – Clean fan Clean combustion chamber Clean heat exchanger...
  • Page 19: Technical Data

    Technical data Series HTL 400 Nom. heat load max 2. Stage Nom. heat load max. 1. Stage Nom. heat output max. 2. Stage Nom. heat output max 1. Stage Ventilating performance max. 2. Stage 25000 Ventilating performance max. 1. Stage...
  • Page 20 , a partner that helps solve REMKO problems. Sales REMKO not only provides an extensive sales network in Germany and abroad, but also unusually highly qualified sales experts. REMKO sales representatives are more than just salespeople: above all they have to be consultants: to our customers in the field of air conditioning and heat-...

Table of Contents