9. GPS antenna connector.
Holder
▪
Power/CAN cable
▪
Fixings - 1 adhesive strip, 4 self-tapping screws and a cleaning tissue
▪
Basic installation guide
▪
What you need for the installation
Before starting the installation of your LINK 710, read the installation instructions and
the safety notices and warnings carefully and make sure you have the following:
The Contract Confirmation letter including the Activation Code.
▪
A device with internet connection and software to scan and read QR codes.
▪
The QR code of the LINK 710, which is printed on a sticker on the bottom of the
▪
device.
The login credentials to the LINK Toolkit app.
▪
All parts contained in the box.
▪
A connection to the vehicle's power supply that is fused with max. 10A.
▪
A place with a clear view of the sky where you can move your vehicle to check
▪
GPS reception.
A Driver Terminal that is compatible with LINK 710* - optional.
▪
* To check available LINK 710 accessories or device compatibility please visit
www.webfleet.com/products
https://
6
Need help?
Do you have a question about the LINK 710 and is the answer not in the manual?