First Steps; Assembly - BRAND Dispensette TA Operating Manual

Trace analysis
Hide thumbs Also See for Dispensette TA:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 23

First Steps

Is everything in the package?
Confirm that your package includes:
Bottle-top dispenser Dispensette
tion valve and recirculation tube (optional), mounting tool, three bottle adapters, a performance certificate
and this operating manual.
Nominal volume, ml
Dispensette
TA
®
10

Assembly

Warning:
Wear protective clothing, eye protection and gloves! Follow all safety
instructions and observe limitations of use and operating limitations
(page 24-26).
1.
Check safety ring
2.
Check sealing
washer(s)
3.
Mounting the
SafetyPrime™
recirculation valve
(optional)
4.
Mounting the
Discharge tube
Note:
Recirculation valve and discharge tube must correspondent to the
model. After two days tighten the locking nut.
Before use in trace analysis, the instrument must be thoroughly clea-
ned first. See 'Cleaning for trace analysis' (page 36).
28
TA, discharge tube, telescoping filling tube, SafetyPrime™ recircula-
®
Adapters for
bottle thread
GL 38/ S 38 (ETFE), GL 32 (ETFE),
S 40 (PTFE)
Make sure that safety ring is firmly
tightened.
Before mounting the SafetyPrime™
recirculation valve or the discharge tube
make sure that the sealing washer is
always inserted.
Push the SafetyPrime™ recirculation
valve approx. 2 mm into the discharge
tube and firmly finger-tighten the locking
nut (Fig. 3). Check the SafetyPrime™
recirculation valve for a tight fit.
Push the discharge tube (optional with
SafetyPrime™ recirculation valve) ap-
prox. 2 mm into the valve block and and
firmly finger-tighten the locking nut
(Fig. 4). Check the discharge tube for a
tight fit.
Filling tube
Length, mm
125-240
1
2
3
4

Advertisement

Table of Contents
loading

Table of Contents