7.1    Putting the PTO shaft into operation
The PTO shaft is an essential part of the machine.
There are a number of matters that need to be watched out for:
See PTO drive shaft manual
of
http://www.gkn-walterscheid.de/downloads/anleitungen
Points of attention
1.
The length of the PTO shaft.
With the shortest operating distance between the tractor and the machine, the PTO shaft
must still be able to slide in by 40 mm / 1.6 inch . In this, account must be taken of:
The minimum profile overlap is: See PTO shaft manual
2.
Attach overloading/freewheel clutch or bolt connection (conical) at the machine end
A hydraulic top link (if present) in its shortest position
Putting the machine into operation