Samsung AVMBH020CA0 Installation Manual page 14

System air conditioner
Hide thumbs Also See for AVMBH020CA0:
Table of Contents

Advertisement

Drain Hose Installation (cont.)
Water supply intake
14
E-
Testing the drainage
Prepare a little water about 5 liters.
1
Open the cover of water supply intake by turning and pulling the cover.
2
Pour water into the the indoor unit as shown in figure.
N N
o o
t t
e e
If you do not pour water inside the water supply intake,
N N
o o
t t
e e
water may spill from the indoor unit.
3
Confirm that the water flows out through the drain hose.
Reassemble the cover of water supply intake.
4

Advertisement

Table of Contents
loading

Table of Contents