Installing The Pipework - Viessmann Vitomax HW Series Installation Instructions Manual

High pressure hot water boilers
Hide thumbs Also See for Vitomax HW Series:
Table of Contents

Advertisement

Boiler connections
Boiler size
Tab. 11

Installing the pipework

Danger
Risk of injury when opening pressurised boiler
flue connections.
Do not open boiler flue connections until they
are depressurised and have cooled down.
Fig. 3
Illustrative example. Standard delivery may
vary subject to order.
Boiler return connector
A
Boiler flow connector
B
Safety valve connector
C
High limit safety cut-out – sleeve R
D
Temperature controller – sleeve R
E
Control equipment – sleeve R
F
Drain connector
G
Hole for equipotential bonding
H
(cont.)
13 bar
PN 40 DN
16 bar
PN 40 DN
18 bar
PN 40 DN
20 bar
PN 40 DN
½
½
(additional)
½
13 mm
7
1
2
3
40
50
50
50
40
40
50
50
40
40
40
50
32
40
40
50
!
Please note
Unsuitable water quality can damage the boiler
shell.
Only fill the boiler with water that complies with
the "Standard values for water quality" (see
service instructions).
4
5
6
7
65
65
80
65
65
65
50
65
65
50
65
65
8
9
80
100
80
80
80
80
65
80
11

Hide quick links:

Advertisement

Table of Contents
loading