turbofan PM Series Installation And Operation Manual

Proofer/holding cabinets

Advertisement

Quick Links

P * * M S e r i e s
P r o o f e r / H o l d i n g C a b i n e t s
( M a n u a l O p e r a t i o n )
I n s t a l l a t i o n a n d O p e r a t i o n M a n u a l
234277-15

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PM Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for turbofan PM Series

  • Page 1 P * * M S e r i e s P r o o f e r / H o l d i n g C a b i n e t s ( M a n u a l O p e r a t i o n ) I n s t a l l a t i o n a n d O p e r a t i o n M a n u a l 234277-15...
  • Page 2 Moffat Limited Rolleston 7675 New Zealand AUSTRALIA Moffat Pty Limited Web: www.moffat.com.au E.Mail: vsales@moffat.com.au Main Office: (tel) +61 (03) 9518 3888 (fax) +61 (03) 9518 3838 Service: (tel): 1800 622 216 Spares: (tel): 1800 337 963 Customer Service: (tel): 1800 335 315 (fax): 1800 350 281 CANADA Serve Canada...
  • Page 3 Contents List - Turbofan Proofer / Holding Cabinet - 8 Tray. P10M - Turbofan Proofer / Holding Cabinet - 10 Tray. P12M - Turbofan Proofer / Holding Cabinet - 12 Tray. P85M8 - Turbofan Proofer / Holding Cabinet - 8 Tray.
  • Page 4 If you are unsure of any aspect of the installation, instructions or performance of your Proofer / Holding Cabinet, contact your TURBOFAN dealer promptly. In many cases a phone call could answer your question. Should you contact your TURBOFAN dealer on any matter concerning this Proofer / Holding Cabinet , please have the information provided opposite, readily available.
  • Page 5: Specifications

    Specifications P8M Proofer / Holding Cabinet P12M Proofer / Holding Cabinet 110-120V, 1P+N+E, 60HZ, 1.45kW 110-120V, 1P+N+E, 60HZ, 1.95kW 220-240V, 1P+N+E, 50/60HZ, 1.50kW 220-240V, 1P+N+E, 50/60HZ, 1.90kW 8, 18” x 26” / 460 x 660, Full Size Sheet Pan Capacity. 12, 18”...
  • Page 6 Specifications P10M Proofer / Holding Cabinet 110-120V, 1P+N+E, 60HZ, 1.45kW 220-240V, 1P+N+E, 50/60HZ, 1.50kW 10, 1/1 GN Gastronorm Pan Capacity. 10, 20” x 12”, Hotel Steam Pan Capacity. 10, 18” x 13” Half Size Sheet Pan Capacity. 74mm / 2 ”...
  • Page 7 Specifications P85M8 Proofer / Holding Cabinet P85M12 Proofer / Holding Cabinet 110-120V, 1P+N+E, 50/60HZ, 1.45kW 110-120V, 1P+N+E, 50/60HZ, 1.95kW 230-240V, 1P+N+E, 50HZ, 1.50kW 230-240V, 1P+N+E, 50HZ, 1.90kW 8, Full Size Sheet Pan Capacity. 12, Full Size Sheet Pan Capacity. 16, Half Size Sheet Pan Capacity. 24, Half Size Sheet Pan Capacity.
  • Page 8: Installation

    2. The Proofer / Holding Cabinet should be positioned so that the control panel and shelves are easily reachable for loading and The Turbofan Proofer / Holding Cabinets are supplied with electrical unloading. cords fitted . Ensure that the appliance is fitted with the appropriate power cord and plug.
  • Page 9 Installation 1. A cold water supply should be connected to the water inlet located on the rear right hand side of the unit. 2. Connect to the water supply. Water Connection - Max Inlet Pressure 80psi / 550kPa. 3. Turn ‘On’ the water supply to check for water leaks. NOTE: The Proofer / Holding Cabinet can be fitted with an optional Water Filter Kit (Part No.
  • Page 10: Operation

    Operation  Turbofan Proofer / Holding Cabinets have been designed to provide simple operation.  This Proofer / Holding Cabinet is intended for use in a commercial kitchen and must only be put to the use for which it was intended, i.e.
  • Page 11 Operation Ensure that power to the Proofer / Holding Cabinet is switched ‘On’ Ensure that power to the Proofer / Holding Cabinet is switched and the mains water supply is turned ‘On’. ‘On’. It is recommended that the Proofer / Holding Cabinet is pre-heated empty before loading with product.
  • Page 12: Cleaning And Maintenance

    Cleaning and Maintenance Side Racks - P8M/ P12M a. To remove side racks for cleaning, take hold of top and bottom of rack and lift front of rack upwards to disengage front upper and lower hangar studs. b. Swing the rack inwards. c.
  • Page 13 Cleaning and Maintenance Water Tank Door It is recommended that this procedure is carried out once a a. Wash door with warm water and a mild detergent solution week. Frequency of cleaning the element may be increased using a soft sponge in straight lines up and down inner and or decreased depending on the quantity of scale depositing outer surfaces of door.
  • Page 14: Fault Finding

    Fault Finding This section provides a reference to the more common problems You may encounter a problem not covered in this section, please that may occur during the operation of your Proofer / Holding contact your service provider who will require the following Cabinet .
  • Page 15: Electrical Schematic

    Electrical Schematic...
  • Page 16: Replacement Parts List

    Cabinet. The instructions supplied with the parts should be followed when replacing components. For further information and servicing instructions, contact your nearest authorized service provider or Turbofan Dealer. When ordering replacement parts, please quote the part number and the description as listed below. If the part required is not listed below, request the part by description and quote model number and serial number which is shown on the Technical Data Plate.
  • Page 17: Appendix 1 - Proofer Door Reversal

    Appendix 1 - Proofer Door Reversal NOTE: NOTE:  Refit all screw fasteners using a low-mid strength thread locking adhesive unless otherwise stated.  Refit all screw fasteners using a low-mid strength thread  Door reversal should only be carried out by a suitably locking adhesive unless otherwise stated.

This manual is also suitable for:

P8mP seriesP85m8P85m12P10mP12m

Table of Contents