Page 1
Cable Configure Create a for installation hardware the node the node new cluster NetApp H-series Element storage nodes Installation and Setup Instructions Prepare for installation | Stage 1 NODE B NODE B NODE D NODE D NODE A NODE A...
Page 2
Install hardware | Stage 2 Steps 1 and 2 do not apply if you are adding a new node to an existing two rack unit (2U), four-node chassis. Install the rails. Note: • Ensure that you have installed the rack according to the safety instructions from the manufacturer. •...
Page 3
Cable the node | Stage 3 Cable the node If the airflow vents at the rear of the chassis are blocked by cables or labels, it can lead to premature component failures due to overheating. If you are adding nodes to an existing installation, ensure that the cabling and network configuration of the nodes that you add are identical to the existing installation.
Page 4
After you save the settings, the node is in a pending state, and can be added to a cluster. See the NetApp Element Software Setup Guide for configuration instructions. You can access the latest version of the Setup Guide from the NetApp SolidFire Resources page.
Page 5
UI by entering the node’s IP address. Enter the required information in the Create a New Cluster window. See the NetApp Element Software Setup Guide for instructions. You can access the latest version NetApp SolidFire Resources of the Setup Guide from the page.
Need help?
Do you have a question about the H Series and is the answer not in the manual?
Questions and answers