IBM 8408-E8D Manual page 40

Power systems
Hide thumbs Also See for 8408-E8D:
Table of Contents

Advertisement

c. In the operations area, click Update passwords.
Note: If the server is managed by a second HMC, ensure that you also update the password on
the second HMC.
4. Update the time of day on the managed system by using the Advanced System Management Interface
(ASMI).
To set up and access the ASMI, complete the following steps:
a. In the navigation area, expand Systems Management > Servers.
b. In the content area, select the managed system.
c. In the task area, expand Operations.
d. Click Launch Advanced System Management (ASM).
To change the time of day by using the ASMI, complete the following steps:
a. On the ASMI Welcome pane, type your admin user ID and password, and click Log In.
b. In the navigation area, expand System Configuration.
c. Click Time of Day. The right pane displays a form that shows the current date (month, day, and
year) and time (hours, minutes, and seconds).
d. Change the date value, the time value, or both, and click Save settings.
5. Check the firmware level on the managed system.
To check the firmware level on the managed system, in the navigation area, click Updates. Firmware
information is displayed in the contents area.
6. Compare your installed firmware level with available firmware levels. If required, update your
firmware levels:
a. Compare your installed firmware level with available firmware levels. For more information, see
the Fix Central website (http://www.ibm.com/support/fixcentral/).
b. If required, update your managed system firmware levels. In the navigation area, click Updates.
c. In the contents area, select your managed system.
d. Click Change Licensed Internal Code for the current release.
7. Power on your managed system by using the correct power-on parameters. To power-on your
managed system by using the HMC, complete the following steps:
a. View your managed system's properties and verify that the logical partition Start policy is set to
User-Initiated. To verify that the logical partition start policy is set to User-Initiated, complete the
following steps:
1) In the navigation area, expand Systems Management > Servers.
2) In the content area, select the managed system.
3) In the tasks area, click Properties.
4) Click the Power On Parameters tab.
5) Ensure that the Partition start policy field is set to User-Initiated.
b. Power on the managed system. To power on the managed system, complete the following steps:
1) In the navigation area, expand Systems Management > Servers.
2) In the content area, select the managed system.
3) Click Operations > Power On.
4) Select the Normal power-on option, and click OK.
8. Create partitions or deploy an imported system plan:
v For instructions about creating partitions, see Partitioning with the HMC (http://
publib.boulder.ibm.com/infocenter/systems/scope/hw/topic/p7hat/iphbllparwithhmcp6.htm).
v For instructions about deploying system plans, see Deploying a system plan by using an HMC
(http://publib.boulder.ibm.com/infocenter/systems/scope/hw/topic/p7hc6/
iphc6deploysysplanp6.htm).
28
Power Systems: Installing the IBM Power 750 (8408-E8D) and IBM PowerLinux 7R4 (8248-L4T)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Power 750Powerlinux 7r48248-l4t

Table of Contents