Figure 11. Removing the lift handles
5. Push the system all the way into the rack.
6. Install the screws (A) to secure the system to the rack.
Figure 12. Pushing the system into the rack
12
Power Systems: Installing the IBM Power 750 (8408-E8D) and IBM PowerLinux 7R4 (8248-L4T)