20
ACCEPTANCE LOG
PROJECT:
PRODUCT:
SERIAL NO.:
CLIENT:
NAME / COMPANY / ADDRESS:
CONTRACTOR:
NAME / COMPANY / ADDRESS:
INSTALLATION:
NAME / COMPANY / ADDRESS:
Client accepts the performances of the contractor. The instructions for installation and
use, clamp log, photo documentation and test sheets have been transferred to the
client (building owner) and have been made available to the user. When accessing
the fall protection system, you must document the positions of the anchorage devices
by means of diagrams (e.g. top view of the roof).
The expert fitter familiar with the safety system confirms that the installation
work has been executed properly, in accordance with the state of the art,
and in accordance with the manufacturer's instructions for installation and
use. The safety specifications for reliability are confirmed by the installation
company.
COMMENTS:
20
SYST-20-475-695 / Version 170512 / www.innotech.at