To connect the unit to the network:
1. Turn off power to the control box.
2. Cut the CCN wire and strip the ends of the red (+), white
(ground), and black (–) conductors. (Substitute appropriate
colors for different colored cables.)
3. Connect the red wire to (+) terminal on CIB, the white wire
to COM terminal, and the black wire to the (–) terminal.
4. The RJ14 CCN connector on CIB can also be used, but is
only intended for temporary connection (for example, a
laptop computer running Carrier network software).
5. Restore power to unit.
BUILDING SUPERVISOR
NETWORK
OPTIONS
REMOTE
AUTODIAL
CCN SITE
GATEWAY
NON CARRIER
HVAC
EQUIPMENT
COMFORT
CONTROLLER
CCN BUS
ROOFTOP
UNIT
CL
ROOFTOP
UNIT
CL
TERMINAL
SYSTEM
MANAGER
CL
ROOFTOP
UNIT
AIR DISTRIBUTION-DIGITAL AIR VOLUME CONTROL (DAV)
Fig. 24 - - CCN System Architecture
IMPORTANT: A shorted CCN bus cable will prevent some
routines from running and may prevent the unit from starting. If
abnormal conditions occur, unplug the connector. If conditions
return to normal, check the CCN connector and cable. Run new
cable if necessary. A short in one section of the bus can cause
problems with all system elements on the bus.
ROOFTOP
UNIT
CL
ROOFTOP
UNIT
CL
HEATING/COOLING UNITS
TCU
TCU
DAV AIR
DAV AIR
TERMINAL
TERMINAL
62
LEGEND
CCN -- Carrier Comfort Network
CL
--
ComfortLink Controls
DAV --
Digital Air Volume
HVAC -- Heating, Ventilation, and
Air Conditoning
TCU -- Terminal Control Unit
TO
ADDITIONAL
TERMINALS
TCU
DAV FAN
POWERED
MIXING
BOX
®
C07030

Advertisement

Table of Contents
loading

This manual is also suitable for:

48lc 0550lc 0550lc 0648lc 0650lc 04

Table of Contents