When lifting the unit work with someone of similar build
Choose one person to call the signals.
Lift from the hips at the same time, then raise the unit to
Move smoothly in unison.
Larger units may require a team lift.
Preparation/placing the appliance in position.
The 'first fix' pipework positions should be checked using the template provided with
each appliance. If these have been followed installation is very simple and much
quicker than any other system.
The appliance is supplied shrink wrapped on a timber installation base. Carrying
handles are also provided in the back of the casing.
The feed and expansion cistern complete with ballvalve, cold feed/expansion and
overflow/warning pipe fittings are provided in a separate box.
If flexible connections have been ordered these will also be inside the feed and expansion
cistern.
The appliance should be handled carefully to avoid damage and the recommended
method is shown above.
Note: Although the above guidance is provided any manual handling/lifting operations
will need to comply with the requirements of the Manual Handling Operations
Regulations issued by the H.S.E.
The appliance can be moved using a sack truck on the rear face although care should
be taken and the route should be even.
In apartment buildings containing a number of storeys we would recommend that the
appliances are moved vertically in a mechanical lift.
If it is proposed to use a crane expert advice should be obtained regarding the need
for slings, lifting beams etc.
HANDLING
and height if possible.
the desired level.

2.0INSTALLATION

2.2 INSTALLATION
Before installation the site requirements
should be checked and confirmed as
acceptable.
The plastic cover and protective wrapping
should be removed from the appliance and
the installation base (provided) placed in
position.
The appliance can then be lifted into
position in the cupboard on top of the base
and the front panel removed by unscrewing
the 2 screws and lifting the door up and out,
ready for connection of the pipework and
electrical supplies.
The feed and expansion cistern support
shall be installed ensuring that the base
is fully supported, the working head
of the appliance is not exceeded and
the recommended access is provided for
maintenance - see section 1.2 Technical Data