Lamtec GFI 48 Operating Instructions Manual page 43

Ignition and pilot burner
Hide thumbs Also See for GFI 48:
Table of Contents

Advertisement

5
Commissioning
Perform leak test
NOTICE
The regional requirements for the leak test must be observed and complied with.
Perform functional test
Perform the functional test as follows:
1
NOTICE
2
3
If the functional test was successful, the flame scanner has been correctly
commissioned.
- Otherwise, the fuel supply is to be closed immediately.
- Check electrical connections and the configuration of the system control.
- Disconnect the pilot burner from the system control.
- Do not place the pilot burner into operation.
- Contact the manufacturer.
Check the pilot light of the of the flame scanner with the fuel feed closed off (flame off).
The flame scanner pilot lamp is only visible with the bar graph option.
If there is no bar graph included with the delivery, alternatively check the flame relay (NO)
for correct function
The pilot light must be off, and the relay contact must be open.
Ignite the flame.
The pilot light must be lit, and the relay contact must be closed.
Extinguish the flame.
The pilot light must go out, and the relay contact must open again.
42

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gfi 89Gfi 70

Table of Contents