Connect the upper connection of the cross unit with the test device • Creation date: 06.01.2009 • (Addendum VH: 09.12.2013) rbr Messtechnik GmbH • Am Großen Teich 2 • D-58640 Iserlohn • Tel. +49 (0)2371/945-5 • Fax +49 (0)2371/40305 Internet www.rbr.de • E-Mail info@rbr.de...
Page 6
Attention: open windows, doors or ventilation as well as temperature changes might influence the tightness check • Creation date: 06.01.2009 • (Addendum VH: 09.12.2013) rbr Messtechnik GmbH • Am Großen Teich 2 • D-58640 Iserlohn • Tel. +49 (0)2371/945-5 • Fax +49 (0)2371/40305 Internet www.rbr.de • E-Mail info@rbr.de...
The complete assembling (without instrument) is kept under water and according to the bubbles the leakage can be recognised. • Creation date: 06.01.2009 • (Addendum VH: 09.12.2013) rbr Messtechnik GmbH • Am Großen Teich 2 • D-58640 Iserlohn • Tel. +49 (0)2371/945-5 • Fax +49 (0)2371/40305 Internet www.rbr.de • E-Mail info@rbr.de...
Need help?
Do you have a question about the Ecom-DP and is the answer not in the manual?
Questions and answers