Suf Muffler - State Water Heaters Utra-Force STC-077 Service Handbook

Commercial gas water heaters with 94% thermal efficiency and electronic control system
Table of Contents

Advertisement

N O T E S :
1. Install muffler in vertical position only.
2. Muffler must be a minimum of 8" from top of condensate elbow.
3. The muffler inlet and outlet are 4" PVC. If venting with a 4" PVC, a 4" x 4" PVC coupling (field
supplied) must be cemented to each end of the muffler. If venting with 3" PVC, a 4" x 3" PVC
reducing coupling (field supplied) must be cemented to each end of muffler (see illustration
above.)
4. Cement muffler into a location using ASTM D-2564 grade cement.
5. Secure muffler to suitable structure.
6. Operate heater through 1 heat cycle to ensure there are no exhaust leaks and there is no
obstruction of exhaust flow.
State Water Heaters
Ashland City, Tennessee © 2004
S U F
S E R V I C E
S E R V I C E

SUF MUFFLER

37
H A N D B O O K
A I D S
Technical Training Department
STC-077

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents