Maintenance - TMC Aquarium REEF EASI-Dose Plus Series Instructions For Installation And Use Manual

Table of Contents

Advertisement

MAINTENANCE

1. Regularly check all connections to make sure they are secure and that the EASI-Dose Plus
unit is functioning correctly.
2. During routine maintenance, the dosing pump heads and the silicone hosing must be
checked for any signs of wear or degradation and must be replaced accordingly. Failure to
do so could result in dosing inaccuracies, operating problems and damage to the dosing
pump. Spares are available from your local stockist. These consumable items are not
covered under the 12 month guarantee (please see back page for details on all available
accessories and spares).
REPLACING THE DOSING PUMP HEAD
1. To replace the dosing pump head, squeeze the left and right tabs
either side of the head and gently but firmly pull the pump head
forward.
2. To replace, ensure the pump shaft sits centrally in the dosing
pump head and push onto the EASI-Dose Plus unit, ensuring the
clips are aligned left and right. Firmly push the dosing pump head
on until it clicks into place. Check the pump head is operational
by pressing and holding button D (Manual Feed/+) until liquid is
successfully passing through.
11

Advertisement

Table of Contents
loading

Table of Contents