4 Option Components
4
Option Components
◆
SI-EP3/V PROFINET Option
Figure 1
Option with cover attached
A
B
C
A – LED (MS)
B – LED (NS)
C – Option cover
D – PROFINET PCB
E – Screw hole (attaching option cover)
F – Nameplate
G – Functional Earth cable connection (FE)
H – Mounting tabs
I – Ground wire
J – Pass-through hole for ground wire
<1>
Refer to Option LED Display on page 14
<2> Ground wires are packaged loose inside the option packaging and must be connected during installation.
12
Option Underside
CN5 connector port
<1>
<1>
<2>
for details on the LEDs.
Figure 1 Top Views of Option
YASKAWA TOEP YEACOM 06A V1000 Option PROFINET SI-EP3/V Installation Manual
Option with cover removed
S
R
H
O
Q
P
K – Port 2 LED (10/100)
L – Port 2
M – Port 2 LED (LINK/ACT)
N – Port 1 LED (10/100)
O – Port 1
P – Port 1 LED (LINK ACT)
Q – PROFINET cable connection
R – Option connector (CN5)
S – Option Firmware Label
(VST)
L
N
M
K
J
<1>
<1>
D
E
F
G
H
I
<1>
<1>