GoBoard Wedge Installation
22
Using front and back panel edges, mark 45 degree angles on left
and right wedge panels.
IMPORTANT: DO NOT mark angles from corners of shower
pan area. Angles MUST be 45 degrees from center of drain
location.
24
Dry fit all four wedge panels to ensure that there is a 1/8" gap
between wedge panels, clamping collar, side walls and curb.
26
©2019 Johns Manville. All Rights Reserved
(continued)
23
After removing all wedge panels from shower pan, cut along marks
to final size. Ensure there is a 1/8" gap at clamping collar, outside
walls and between wedge panels.
Note: Use straight edge for cut (always cut to inside of mark 1/16").
25
Mix thin set mortar per manufacturers instructions and apply to
subfloor using a 3/16" V-notched trowel. Use a 1/4" x 1/4" square
notch trowel if additional height is needed or rough subfloor.
Install left and right wedge panels by pressing firmly into thin set.
Ensure that there is a 1/8" gap at clamping collar and side walls.
Note: Thicker side of wedge panels to outside of enclosure.