Download Print this page

Johns Manvillle GoBoard Point Drain Installation Instructions Manual page 6

Advertisement

GoBoard Wedge Installation
17
After removing wedge panels from shower pan area, cut along marks
on front and rear wedge panels. Dry fit panels to ensure that there is
a 1/8" gap at clamping collar, side walls and curb.
Trim wedge panels as needed to maintain 1/8" gaps.
Note: Use straight edge for cut (always cut to inside of mark 1/16").
19
Transfer measurements (for left and right wedge panels) from
step 19. Cut wedge panels into rectangles discard remainder.
Note: Thinner side of wedge panel should always face the drain.
21
6
(continued)
18
Measure distance between side walls, back wall, curb and
clamping collar curb for left and right wedge panels.
20
Place wedge panels (left and right) into shower pan area.
Note: Thinner side of wedge panel should always face the drain.
Place cut front and back wedge panels back in shower pan area
on top of uncut left and right wedge panels.
Note: Thinner side of wedge panel should always face the drain.
©2019 Johns Manville. All Rights Reserved

Advertisement

loading