Johns Manvillle GoBoard Point Drain Installation Instructions Manual page 10

Advertisement

Drain Cover Installation
36
Set remaining tile. After tile installation is complete, grout
enclosure and grout or caulk around drain riser and cover.
Make sure the drain cover remains removable.
Note: Illustration of complete installation.
Recommended Layouts
Note: Shower pan areas referenced below DO NOT include GoBoard Curb.
1. Maximum square shower pan area using 4 – 48" x 48"
GoBoard Wedges.
2. Maximum rectangular shower pan
area using 4 – 48" x 48"
GoBoard Wedges
10
(continued)
Complete.
48"
48"
Johns Manville
Building Insulation Division
717 17th Street
Denver, CO 80202
1-800-654-3103, www.JM.com/GoBoard
8-ft x 8 ft durable, lightweght, warterproof backer board
Limited Warranty–Visit JM.com/GoBoard for warranty information
102"
102"
Johns Manville
Building Insulation Division
717 17th Street
Denver, CO 80202
1-800-654-3103, www.JM.com/GoBoard
8-ft x 8 ft durable, lightweght, warterproof backer board
Limited Warranty–Visit JM.com/GoBoard for warranty information
©2019 Johns Manville. All Rights Reserved