Download Print this page

Johns Manvillle GoBoard Point Drain Installation Instructions Manual page 5

Advertisement

GoBoard Wedge Installation
13
Measure distance between side walls, back wall and clamping
collar for back panel and between side walls, curb and clamping
collar for front panel. Account for 1/8" gap when measuring and
cutting.
15
16
©2019 Johns Manville. All Rights Reserved
14
Transfer measurements (for back and front wedge panels) from
step 14. Cut wedge panels into rectangles (discard remainder).
Note: Thinner side of wedge panel should always face the drain.
Use straight edge for cut.
Place wedge panels (front and back) into shower pan area.
Ensure that there is a 1/8" gap at clamping collar and side walls.
Note: Thinner side of wedge panel should always face the drain.
Locate the drain center and mark 45˚ angles on left and right
wedge panels as shown (use corners of clamping collar as
reference points to draw cut lines).
IMPORTANT: DO NOT mark angles from corners of shower
pan area. Angles MUST be 45 degrees from center of drain
location.
5

Advertisement

loading