GoBoard Wedge Installation
13
Measure distance between side walls, back wall and clamping
collar for back panel and between side walls, curb and clamping
collar for front panel. Account for 1/8" gap when measuring and
cutting.
15
16
©2019 Johns Manville. All Rights Reserved
14
Transfer measurements (for back and front wedge panels) from
step 14. Cut wedge panels into rectangles (discard remainder).
Note: Thinner side of wedge panel should always face the drain.
Use straight edge for cut.
Place wedge panels (front and back) into shower pan area.
Ensure that there is a 1/8" gap at clamping collar and side walls.
Note: Thinner side of wedge panel should always face the drain.
Locate the drain center and mark 45˚ angles on left and right
wedge panels as shown (use corners of clamping collar as
reference points to draw cut lines).
IMPORTANT: DO NOT mark angles from corners of shower
pan area. Angles MUST be 45 degrees from center of drain
location.
5