Starting The Appliance - Bosch Worcester Greenstar CDi Conventional Series Instruction Manual

Wall hung rsf gas-fired condensing regular boiler for open vented and sealed central heating systems and indirect domestic hot water
Table of Contents

Advertisement

I
I
I
I
IA-..oO
I
D---+~
0
I
I
F----+llo+'D
L ----+~0
STARTING THE APPLIANCE
K
[818]
I
rn-
E
c::Jooo
H
Dd
M
STARTING THE APPLIANCE
IMPORTANT: Never run the appliance
when the appliance/system is empty
or partially filled.
SWITCHING THE APPLIANCE ON/OFF:
~
Turn on mains power supply.
~
Turn on any external controls.
Set the thermostatic radiator controls to
maximum temperature.
Set the clock/programmer to continuously
ON and the room thermostat to maximum
temperature.
2 A · On/off button
B ·On/off and fault indicator (BLUE)
C · Temperature control
D ·Burner indicator (GREEN)
E · Reset button
F · Service button
H ·Not used
K ·Display
L · Boost button
M ·Not used
N · Automatic air vent
~
Press button (A) and the power on indica·
tor (B) illuminates BLUE. After a few seconds
the display will show the flow temperature.
3
~
Turn the temperature control (C) to maxi·
mum. The burner on indicator (D) illuminates
GREEN when the burner has lit.
NOTE:
• The boiler runs for 15 minutes at minimum
heating output to fill the condensate trap,
the display (K) alternates between "-II-"
and the flow temperature. This occurs every
time the mains supply has been interrupted.
This could take longer than 15 minutes
if
high output is demanded.
4
~
If the boiler fails to light the BLUE power
indicator (B) and reset button (E) will flash
alternately.
To reset press and hold the reset button (E)
for 2 seconds. The boiler will be reset.
INDICATOR (B) TO RESET BOILER.
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER BOSCH GREENSTAR 30CDI/40CDI Coc,ectlocal
~ORCESTER
6 720 614 556a (2007/07)
Bosch Group

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents