User Manual; Activate Ace And Solar Production; Change Ace Limit; Grid Current And Load Current - ferroamp EnergyHub Installation And User Manual

Hide thumbs Also See for EnergyHub:
Table of Contents

Advertisement

User manual

1. Activate ACE and solar production

• Press and hold the display until "Service menu enabled" is shown
• Swipe to the "start and stop" display.
• Choose "ACE & PV" in the drop-down menu
• Set the current limit where the ACE function should start. (Normally the rating of the main
fuse)
• Press Start
• Verify the status at the table view: "ACE & PV"
• Press and hold the display to go back to operational mode.

2. Change ACE limit

• Press and hold the display until "Service menu activated" is shown.
• Press Stop.
• Verify the status in the table view:" Status ...... Inactive"
• Go back to the "Start and Stop" view and choose the new value by using the arrows.
• Press Start.
• Verify the status in the table view
• Press and hold the display to go back to operational mode.

3. Grid current and Load current