Solar String Optimizer Installation manual Revision 3.1, 2017-03-16...
Page 2
Warning • Read the manual before installation • The EnergyHub may not be opened by unauthorized personnel. Contact Ferroamp for instructions. • The electrical installation shall be performed by an authorized electrician in accordance with electrical standards and safety precautions •...
Location of the SSO • Make sure there is enough space around the SSO to enable a safe installation and steady airflow. • The SSO should not be located in direct sunlight. • It is recommended that the SSO are mounted close to the PV-Panels. Advantages: •...
DC connection • Ensure that the EnergyHub is turned off. Do not connect the DC grid contact if the EnergyHub is powered on. • Connect the cables to the 3-pole DC contact as shown below. Please note the order of the cables.