Commissioning
7.
• Start the EnergyHub by turning on the disconnect switch on the AC side.
• Wait 1 minute for the display to start.
• Press the display until "Service menu enabled" shows to enter the setup menu.
• When the finger is removed the "Start and Stop" view is shown. If it fails, please try again without
moving the finger.
• Swipe right and left to change between different views. Go to CT ration.
• Confirm or choose desired ratio for the current sensors. The standard blue current sensor has a
ratio of 2000. Calculation: 100A / 50mA (100/0,05 = 2000)
• In order to change the ratio, press the digit that needs to be changed until it turns green. Use the
arrows to change the value
• Press "Save"
• Swipe to the view with the with button "Run CT configuration"
• Start the calibration by pressing "Run CT Configuration".
• The configuration can take up to 5 minutes, when it is done the massage "Configuration
succeeded" is shown on the display.
• Verify that the system is measuring correctly by swiping to the table view.
• The Installation is done.
• Press and hold until "Service menu disabled" is shown to go back to operational mode.
Page 11 of 19