Commissioning - ferroamp EnergyHub Installation And User Manual

Hide thumbs Also See for EnergyHub:
Table of Contents

Advertisement

Commissioning

7.
• Start the EnergyHub by turning on the disconnect switch on the AC side.
• Wait 1 minute for the display to start.
• Press the display until "Service menu enabled" shows to enter the setup menu.
• When the finger is removed the "Start and Stop" view is shown. If it fails, please try again without
moving the finger.
• Swipe right and left to change between different views. Go to CT ration.
• Confirm or choose desired ratio for the current sensors. The standard blue current sensor has a
ratio of 2000. Calculation: 100A / 50mA (100/0,05 = 2000)
• In order to change the ratio, press the digit that needs to be changed until it turns green. Use the
arrows to change the value
• Press "Save"
• Swipe to the view with the with button "Run CT configuration"
• Start the calibration by pressing "Run CT Configuration".
• The configuration can take up to 5 minutes, when it is done the massage "Configuration
succeeded" is shown on the display.
• Verify that the system is measuring correctly by swiping to the table view.
• The Installation is done.
• Press and hold until "Service menu disabled" is shown to go back to operational mode.
Page 11 of 19

Advertisement

Table of Contents
loading

Related Products for ferroamp EnergyHub

Table of Contents