Step 4b: Installation of Optional Open Storage on Marathoner Gold Ovens Built Before
January 1, 2002
The following describes how to assemble the optional open storage for Marathoner Gold ovens built before
January 1, 2002. All holes are pre-drilled for the provided screws.
1. Attach the legs to the oven as described in installation Step 2a on page 9.
2. Attach the two frame hangers (items "A" in the following drawing) using four screws for each hanger.
The flange-side of each hanger must be on the side of the hanger closest to the edge of the oven.
A
3. Hang the rack guides from the frame hangers, which have two sets of holes. Use the outside holes if
you will be storing racks; use the inside holes if you will be storing pans (see the following drawing).
O
PERATOR
O
VENS
LEGS NOT SHOWN
'
M
1181958
S
ANUAL
A
Side View
Install legs first!
Holes
for
PANS
I
NSTALLATION
A
Bottom View
Holes
for
RACKS
P
AGE
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents