Replacing The Cables/Leads And Sensors30 - Rotex GasSolarUnit Series Installation And Maintenance Instructions Manual

Gas fired condensing boiler
Table of Contents

Advertisement

Fig. 4.4.3: Pulling coded plugs from the PCB
Fig. 4.4.4: Removing leads/cables
Fig. 4.4.5: Undoing the boiler control panel
fixing screws
[ 30 ]
4.5 Replacing the cables/leads and sensors
Fig. 4.5.1: Replacing the return (38) and flow sensor (37)

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GasSolarUnit Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Gsu 35Gcu 25Gcu 35Gascompactunit seriesGsu 25

Table of Contents