With low energy dc motors optional - remote lcd (6 pages)
Summary of Contents for Vectaire WHHR100DC-B Plus
Page 1
"WHHR100/90DC-B Plus" Whole House Heat Recovery Unit with Low Energy DC Motor - for domestic and commercial use Installation, Operating and Maintenance Instructions...
Page 2
Vectaire will not be held responsible and will not accept liability for any damage caused to persons or property through failure to follow the guidance provided in this manual. It should always be available with the product for easy reference.
Page 3
Page 3 Installation IT Is IMPORTANT THEsE INsTRUCTIONs ARE READ FULLY BEFORE INsTALLATION • This product should not be used for any purpose other than that for which it was designed and as shown in this leaflet • All packaging should be removed and the unit checked for damage in transit. If there is any damage, please contact your supplier •...
Page 4
Page 4 Duct and Duct Connections (refer to design drawing) • 4 x 125mm nominal diameter spigots are provided for the connection of ducting. These are clearly marked for correct connection of the supply and exhaust ducts. • Where ducting is installed in an unheated space, all of the ducts should be insulated. Where ducting is in stalled in a heated space, only the cold ducts should be insulated.
Page 5
Heat Exchanger maintenance must be done professionally. Contact Vectaire service Department for Advice. • The air filters of the Vectaire WHHR100/90DC-B Plus should be cleaned regularly by a suitably qualified person (the frequency of cleaning will vary depending on the installation environment).
Page 6
Page 6 Vectaire Ltd, Lincoln Road, Cressex Business Park, High Wycombe, Buckinghamshire, HP12 3RH Tel: +44 (0)1494 522333. Fax: +44 (0)1494 522337. Email: sales@vectaire.co.uk E & O.E WHHR100/90DC-B Plus-Oct 2014...
Page 7
"WHHR100/90DC-B Plus" Bypass models Whole House Heat Recovery Unit with Low Energy DC Motor - for domestic and commercial use Installation, Operating and Maintenance Instructions...
Page 8
Vectaire will not be held responsible and will not accept liability for any damage caused to persons or property through failure to follow the guidance provided in this manual. It should always be available with the product for easy reference.
Page 9
Page 3 Installation IT Is IMPORTANT THEsE INsTRUCTIONs ARE READ FULLY BEFORE INsTALLATION • This product should not be used for any purpose other than that for which it was designed and as shown in this leaflet • All packaging should be removed and the unit checked for damage in transit. If there is any damage, please contact your supplier •...
Page 10
Page 4 Duct and Duct Connections (refer to design drawing) • 4 x 125mm nominal diameter spigots are provided for the connection of ducting. These are clearly marked for correct connection of the supply and exhaust ducts. • Where ducting is installed in an unheated space, all of the ducts should be insulated. Where ducting is in stalled in a heated space, only the cold ducts should be insulated.
Page 11
Page 5 Commissioning The commissioning must only be carried out by a suitably qualified person. Prior to starting the commissioning pro- cedure, ensure that the ductwork con- nections and airflow directions match one of the options A or B, shown on page 3.
Page 12
Page 6 Controller Adjustment diagram Airflow adjustment for Left-Hand Drainage 1. For left hand drainage as shown on Page 5, ensure that the jumper switch JP4 (see diagram above) is in Position B. Normal (trickle) speed (l/h drainage) 2. Before making any adjustments, switch on the unit at trickle speed. WARNINg : 230 volt, live mains are present on the circuit board.
Page 13
Heat Exchanger maintenance must be done professionally. Contact Vectaire service Department for Advice. • The air filters of the Vectaire WHHR100/90DC-B Plus should be cleaned regularly by a suitably qualified person (the frequency of cleaning will vary depending on the installation environment).
Need help?
Do you have a question about the WHHR100DC-B Plus and is the answer not in the manual?
Questions and answers