Yamaha Phazer Venture Lite PZ50MTA 2011 Supplementary Service Manual page 59

Table of Contents

Advertisement

PZ50VTA
Corrugated tube (engine stop
switch lead, throttle switch lead,
right grip warmer lead, and
thumb warmer lead)
Right handlebar switch
Pass the throttle cable over the
handlebar.
Pass the brake hose in front of
the handlebar.
Left handlebar switch
Pass the left handlebar switch
leads behind the handlebar.
Corrugated
tube
(left
warmer
lead,
grip/thumb
warmer adjustment switch lead,
brake light switch lead, and
headlight beam switch lead)
Auxiliary DC jack
Rectifier/regulator
AC magneto lead coupler
Connect the AC magneto lead
side
coupler
(gray)
rectifier/regulator.
Throttle position sensor coupler
(black)
Clamp the AC magneto lead,
throttle position sensor lead,
wire harness (oil pressure sen-
sor lead and oil pressure switch
lead), and pressure regulator
hose with the clamp.
Pass the AC magneto lead
behind the idle adjusting screw
wire.
Clamp the oil cooler inlet hose,
idle adjusting screw wire, and oil
pressure switch lead with the
clamp. Install the clamp with its
buckle positioned towards the
rear of the snowmobile and its
end facing to the right. Do not
clamp the oil pressure sensor
coupler.
Oil pressure sensor coupler
Pass the oil pressure switch
lead under the idle adjusting
screw, making sure that the lead
is not too taut.
Oil pressure switch coupler
(gray)
Starter motor
Knock sensor
Clamp
Pass the throttle body heater
outlet hose behind the engine
mounting bracket.
To the wire harness
Coolant temperature sensor
Thermostat housing cover
To the parking brake
To the brake
Brake hose
Main switch
Pass the corrugated tube, park-
ing brake cable, throttle cable,
meter lead, and brake hose with
the holder.
Clamp the corrugated tube,
grip
parking brake cable, throttle
cable, meter lead, and brake
hose with the clamp.
Corrugated tube (engine stop
switch lead, throttle switch lead,
right grip warmer lead, and
thumb warmer lead)
Meter lead
Parking brake cable
to
the
Throttle cable
Corrugated
warmer
lead,
warmer adjustment switch lead,
brake light switch lead, and
headlight beam switch lead)
Install the clamp with its buckle
positioned behind the leads,
cables, and hose and its end
facing to the right. Be sure to
position the corrugated tube
(engine stop switch lead, throt-
tle
switch
warmer
lead,
warmer lead) and corrugated
tube (left grip warmer lead, grip/
thumb
warmer
switch lead, brake light switch
lead, and headlight beam switch
lead) towards the front and
clamp the throttle cable at the
throttle cable adjusting nut. For
other leads, order insignificant.
CABLE ROUTING
Position the corrugated tube
(engine stop switch lead, throt-
tle
warmer
warmer lead) and corrugated
tube (left grip warmer lead, grip/
thumb
switch lead, brake light switch
lead, and headlight beam switch
lead) towards the front of the
guide. For other leads, order
insignificant.
tube
(left
grip
grip/thumb
lead,
right
grip
and
thumb
adjustment
49
SPEC
switch
lead,
right
grip
lead,
and
thumb
warmer
adjustment

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents