entering into the unit. Seal the holes where pipes
and wires are inserted, by using a insulation (fi eld-
supplied).
If the fi eld-supplied piping is connected with
3
stop valves di- rectly, it is recommended use a tube
bender.
Check to ensure that the stop valves are closed
4
completely before connecting pipes.
Connect the fi eld supplied refrigerant pipes to
5
the indoor unit and outdoor unit. Apply the oil thinly at
the seat fl are nut and pipe before tightening.
The required tightening torque is as follows:
Pipe Size
Ø 6.35 mm (1/4)
Ø 9.53 mm (3/8)
Ø 12.70 mm (1/2)
Ø 15.88 mm (5/8)
Ø 19.05 mm (3/4)
After connecting the refrigerant piping, seal the
6
open space between knockout hole and refrigerant
pipes by using insula- tion material
Unit
Side
Operation of stop valve should be performed
7
according to the fi gure below.
Close before shipment
Outdoor unit stop valve
Spindle Type
Can BREEZE Operating and Maintenance Cooling Unit Instructions 8-14 kW www.canovate.com
38
l
Tightening Torque (Nm)
Nº
Description
1
Insulation Material
2
Insulation Material
3
Field Supplied
4
Insulation Material
8-14 kW
1
2
3
4
20
40
60
80
100
l
info@canovate.com
l
P. +90 216 484 2222