Operating Manual; First Start; Preparation Of The Machine - UNIA TERIS XL H Series Operating And Maintenance Manual

Secondary tillage roller
Table of Contents

Advertisement

OPERATING AND MAINTENANCE MANUAL TERIS XLH / TERIS XXLH

3. Operating Manual

3.1

First Start

Before the first start of the machine:
read the Operating Manual thoroughly
check technical condition of the machine, and in particular, condition of its working parts and
the hydraulic system. When finding any damaged or worn parts, replace them with new ones
check tightening of all screws, bolts and nuts. Tighten any loose nuts especially at the
beginning of operation of the machine
check fitting of the quick-connectors of the hydraulic hoses of the machine to the sockets on
the tractor
check, whether the rollers can rotate without any jams
check the pressure in tyres acc. to the manufacturer's recommendations
check, whether the components requiring lubrication are lubricated
check, whether the machine attachment system fits the tractor attachment system
3.2

Preparation of the Machine

pressure in the tractor wheels must be equal on the
same axle in order to provide uniform working depth of
the machine
the tractor lower links [C] must be stiffened (lock the
oblong holes) and at the same height above the ground
level
set the lifting rods of the tractor links [W] so that you can
pull down the lower links to the height equal 15 cm
below the hitch axle in order to achieve the required
working depth, while obtaining sufficient lifting height of
the links for transport
mount the front axle weights in order to keep balance of
the tractor and the machine
quick-connectors of the machine hydraulic hoses must fit
the sockets on the tractor
the hitch axle should be in the middle of the machine
category of the lower articulated joint of the hitch axle
must be the same on both the tractor and the machine
sides!
- 13 -
Fig. 3: Tractor lifting rod
Fig. 4: Front axle weight

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents