lift to adjust for leveling. Each post has this adjustment. Adjust the proper columns to level the
lift. Place level on each runway and crossbeam and check for proper levelness.
will lock the Lock Ladder in position.
up and down level.
14
13
8
15
13
12
11
8
9
10
-
Need help?
Do you have a question about the PP9 Plus and is the answer not in the manual?