TOOLS REQUIRED

INSTALLATION INSTRUCTIONS

that is already connected to the cylinder. Locate the hole in the side of the runway and install the
upside down. Place this runway in your bay with the hydraulic fitting facing toward your
previously chosen corner for the power unit.
ing bracket in the above chosen corner. Arrange the other three columns in the remaining corners.
6.
If you have means for securely lifting the Crossbeam, lower it into the tops of the columns. If you don't,
then the columns will have to be placed horizontal, and the crossbeams installed in the columns.