Position the Crossbeams at the second lowest locking position on all columns.
beam rail to the outside of the other Crossbeam rail measure's 184.5". Compare the measurements from
the runways later.
for Cable routing installation.
14.
Reinstall the Cable Sheaves, Shafts, Spacers and hardware as shown in
7