Download Print this page

GE RAK204U Installation Instructions Manual page 3

Sub-base

Advertisement

Available languages

Available languages

INSTALLATION FOR 230/208V MODELS
Follow the installation instruction with the Power Supply
Kit if RAK4002D Junction Box Kit to install junction box
and connect to the unit wiring.
CONDUIT INSTALLATION FOR 265V
UNITS (ALL MODELS)
1. Use the round hole at the bottom of the junction box
to attach conduit coming from the branch circuit.
Attach the conduit using proper conduit connector
and bring wires into the junction box. Leave 6" of wire
free at the end of the conduit to allow connections to
be made.
2. If a fuse and fuse holder are to be used, the knockout
at the side of the box is for mounting a Buss Fuse
holder. Be sure the fuse and fuse holder are of the
same rating as the branch circuit. Leadwires at the
fuse can be either soldered in place or attached using
UL-listed 1/4" female (receptacle) crimp connectors.
CHASEWAY INSTALLATION FOR 265V
MODELS WITH STEEL CONTROL BOX
COVER.
The chaseway can be used several ways in conjunction
with the associated knockouts in the junction box and
sub-base to protect and conceal wiring (cordsets/power
supply kits and branch circuit wiring).
1. Wiring is placed between the two halves of the
chaseway. Observe the orientation of the chaseway.
Wiring
Chaseway
2. Align the screw holes and secure the halves together
using two type A screws.
3. Remove the junction box cover by removing the 2
screws on the front and the 2 screws on the inside
rear of the junction box. Retain for re-assembly. Slide
the junction box to the right to clear the mounting slots
on the front of the steel box.
Installation Instructions
Conduit
Chaseway cover
4. Remove the rectangular knockout at the bottom of the
junction box. Remove the rectangular knockout at the
right end of the sub-base.
Junction box
cover
Screws
Chaseway knockout
5. Slide the upper end of the chaseway with wiring
protruding into rectangluar knockout opening in the
junction box. Be sure chaseway "ears" are on the
inside of the box. Drive one type A screw through the
junction box bottom into the chaseway "ear" hole.
Insert lower end of chaseway into rectangular hole
in sub-base and slide to right into the rectangular
knockout making sure chaseway "side ears" are inside
the sub-base. Replace junction box on chassis in
reverse order of Step 3. Route wire toward the center
of the sub-base. Drive one type A screw through the
sub-base slotted hole into chaseway "ear" hole.
6. Recheck to be sure the chaseway "ears" are inside
the junction box and the sub-base and that no wiring
is pinched.
7. Complete the connection of wiring inside the
sub-base either by fully inserting the plug into the
receptacle or attaching to the branch circuit wiring or
inside the sub-base.
8. Complete connections inside the junction box.
For additional information, refer to the installation
Instructions in the Zoneline Owner's Manual.
9. Replace and secure front covers on the sub-base and
junction box. Do not pinch any wires.
3
Junction box
Knock out
Front View

Advertisement

loading

This manual is also suitable for:

Rak204d30cRak204d15cRak204e20cRak204e15cRak204e30cRak204d20c