Start-Up; Electrical System - Homa HRS Series Original Instruction Manual

60 hz
Table of Contents

Advertisement

Now install the angle clamp brackets (Item 3). These represent the bearing point of the motor bracket.
Now lower the mixer on to the bracket in the basin. When the motor bracket lies on the angle clamp bracket, the
connecting cable must be clamped in the cable anchor clamp. At the same time it must be ensured that the cable
is led upwards as tautly as possible so that it is not caught by the delivery

5.3. Start-Up

The mixer must only be started when fully submerged, in order to prevent overheating of the
motor.
Any change of mixer position must only be done with mixer having been switched off and
propeller not rotating.
Before start up, check again that all steps of installation procedure have been properly carried
out. Make sure that the mixer is sufficiently submerged (see chapter 8+9), and that there are no solid
parts in the tank which might damage the propeller. Furthermore, it must be ensured that the mixer is
immersed at least half the diameter of the propeller.
Make sure that all necessary safety precautions have been carried out, e.g. to prevent persons from falling into
the tank. After longer standstill of the mixer, clean the propeller and motor surface from dried remains of mixing
liquid in order to prevent cooling problems.

5.4. Electrical system

Observe the relevant local and national regulations when laying out and selecting the electric lines as well as
when connecting the motor. The motor must be protected by a motor protection switch.
Have the motor connected in accordance with the "Wiring connection" data sheet. Pay attention to the direction of
rotation. If the direction of rotation is incorrect, the machine will not perform as specified, and under certain
circumstances, can become damaged. In accordance with the machine data sheet, check the operating voltage
and make certain that the current consumption remains uniform during all phases.
Make sure that all temperature sensors and monitoring devices, are connected and that their function is tested.
For details on this, see the wiring diagram.
flow.
45