Daikin FXKQ-MAVE Series Technical Data Manual page 18

Ceiling mounted corner cassette
Table of Contents

Advertisement

11
Installation
11 - 1 Drainage instructions
When piping work is finished
Check if drainage flows smoothly. Open the inspection opening,
add approximately 1,000 cc of water slowly into the drain pan and
check drainage flow.
NOTE
1
Use the drain outlet for maintenance to drain water from the
drain pan.
When electric wiring work is finished
Check drainage flow during COOL running, explained under "TEST
OPERATION"
When electric wiring work is not finished
Remove the electric parts box lid, connect power supply and
remote control to the terminals.
Next, press the inspection/test operation button
remote control. The unit will engage the test operation mode.
Press the operation mode selector button
FAN OPERATION
The indoor unit fan and drain pump will start up. Check that the
water has drained from the unit. Press
first mode.
CAUTION
1
Do not connect the drain piping directly to sewage pipes that
smell of ammonia. The ammonia in the sewage might enter the
indoor unit through the drain pipes and corrode the heat
exchanger.
16
• Indoor Units • CEILING MOUNTED CORNER CASSETTE • FXKQ-MAVE
until selection
. Then, press the ON/OFF button
to go back to the
®
• VRV
Systems • Indoor Units
Portable pump
Bucket
on the
.
Copper wire
Inspection opening
Drain outlet for maintenance (with rubber plug)
Power supply
KV1 type 1 ~ 220-240V
Power supply terminal
PC board
Electric parts box lid.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fxkq32maveFxkq40maveFxkq25maveFxkq63mave

Table of Contents