Hide thumbs Also See for EL Series:

Advertisement

EL/GL Series - Mach 3
MLM990S User Guide
Panel Software Version 1.1.0
Jets 1
J1
J2
BL
LT
Blower
Note regarding EL and GL systems: Mach 3 EL and GL systems function
identically, but conform to different International requirements. This
user guide will refer to EL systems for the sake of simplicity, but the
information given applies to both EL and GL products.
900854
Jets 2
102 º F
Light
Jets 1
Jets 2
J1
J2
BL
LT
Blower
Light
balboa-instruments.com
39.0 º C
HT
FC
OZ
Enter
HT
FC
OZ
Enter
Page 1

Advertisement

Table of Contents
loading

Summary of Contents for Balboa EL Series

  • Page 1 Note regarding EL and GL systems: Mach 3 EL and GL systems function identically, but conform to different International requirements. This user guide will refer to EL systems for the sake of simplicity, but the information given applies to both EL and GL products. 900854 balboa-instruments.com Page 1...
  • Page 2 Page 2...
  • Page 3: Table Of Contents

    EL/GL SERIES (Mach 3) CONTROL WITH MLM990S PANEL The MLM990S panel can be used with the EL8000, Time-outs refer to a preset length of time that a EL5000, EL2000 and EL1000 systems. System software function is programmed to operate before shutting off version 28 or higher is required for this panel.
  • Page 4: Overview Of A Start Up And Screen Displays

    A. Overview of a Start Up and Screen Displays Setting the Spa Temperature Using Fast Keys With “Fast Keys” highlighted on the Home display Initial Start-up screen, press . Set the desired spa temperature with When your spa is first actuated, it will go into Priming , then to return Home.
  • Page 5: Light Button

    Light Button C. Spa Functions Turn Equipment On or Off Some systems are equipped with both a spa light and In the “Spa” menu (shown on the “Home” display a fiber optic light; however, only one can be accessed screen), you can control the devices on your system. by this panel.
  • Page 6: Options

    Options If you would like to select continuous filtration, set the Filter 1 start and end times to be the exact same time. Option 1 - None In this case, Filter 2 Start Time only controls when Option 2 - On/Off the second purge happens.
  • Page 7: User Settings

    User Settings E. Additional Options “Home” > Set > > User Settings > Freeze Protection Pressing Enter ( ) on any setting within the User If the temperature sensors within the heater detect a low Settings menu toggles the choices: enough temperature, then the pump(s) and the blower 1) Temp Format from F to C.
  • Page 8: Diagnostic Messages

    Diagnostic Messages Message Meaning Action Required No message on display. The control panel will be disabled until power returns. Power has been cut off to the spa. Time of day will be preserved for 30 days with a battery back-up on EL8000 and EL5000 systems. EL1000 and some EL2000 systems reset the time of day on each power-up.
  • Page 9 Diagnostic Messages (continued) Message Meaning Action Required When your spa is first actuated, it See the M-7 Installation Instruction Manual for complete Priming Mode will go into Priming mode. instructions on Power-up and Pump Priming. The Priming mode will last for up to 4 minutes and then the spa will begin to heat and maintain the water temperature in the Standard mode.
  • Page 10: Periodic Reminder Messages

    Periodic Reminder Messages (Press the “Mode” button to reset a displayed reminder.*) Message ** Frequency *** Action Required Check pH Every 7 days Test and adjust pH chemical levels per manufacturer’s instructions. Check Sanitizer Every 7 days Test and adjust sanitizer chemical levels per manufacturer’s instructions. Clean Filter Every 30 days Remove, clean, and reinstall filter per manufacturer’s instructions.
  • Page 11: Optional Auxiliary Panels

    Optional Auxiliary Panels Note: Below is a partial list of optional auxiliary panels and their basic functions. Please contact your local dealer for a complete list of options that will work with your spa. Jets 1 Jets 1 Jets 1 Jets 1 Jets 2 Blower...
  • Page 12: Basic Installation & Configuration For Mach 3

    Warning! Qualified technician required for service and installation. Basic Installation & Configuration for Mach 3 CSA Compliance/Conformité Caution: Guidelines for Mach 3 EL-Series Spa Controllers. • Test the ground fault circuit interrupter before each use of Use minimum 6AWG copper conductors only. the spa.

This manual is also suitable for:

Gl seriesMlm990s

Table of Contents