Connecting The Tubing To The Pump - ABB AAO100 User Manual

Dosing pump
Table of Contents

Advertisement

Dosing Pump
AAO100

2.4.2 Connecting the Tubing to the Pump

Referring to Fig. 2.5:
1. Cut the end of the tubing straight across.
A
2. Slide union nut
and circlip
3. Push the end of the tubing over nozzle
D
4. Ensure that O-ring
5. Fasten the union nut to valve
Fig. 2.5 Connecting the Tubing to the Pump
IM/DOSPMP Rev. B
B
over the tubing.
C
.
is seated correctly.
E
while pushing the tube onto the nozzle.
A
B
C
D
E
2 Installation
5

Advertisement

Table of Contents
loading

Table of Contents