General; Installations In High Humidity Environments - Bosch BVA 2.0 Series Installation Instructions Manual

Table of Contents

Advertisement

6 | Bosch IDS BVA 2.0

2 General

The unit can be positioned for bottom air return in the upfl ow position, left and right
air return in the horizontal position and top air return in downfl ow position.
This air handler provides the fl exibility for installation in any upfl ow, downfl ow or
horizontal application. Adjust the motor speed tap through the DIP switch (located
on the Air Handler's control board) to select correct air fl ow according to airfl ow
performance table in Section 5. Please refer to wiring diagram for Dip Switch
settings.
Please refer to Figure 8 for high and low voltage wiring connections.
To ensure the proper installation, select a solid and level site. Ensure enough
clearance is maintained for installation and maintenance.
4
" 0
Clearances in the Horizontal Position
Front of unit
Clearances in the Vertical Position
Figure 2
Required Clearances
NOTICE:
The installed unit must have the required clearances as
shown in Figure 2. Failure to follow these instructions may
result in equipment damage and/or premature equipment
failure.
WARNING: FIRE HAZARD
Keep flammable material and vapors, such as gasoline, away
from the air handler. Failure to follow these instructions can
result in death, explosion, or fire.
Data subject to change
AIRFLOW
≥40"
25''

2.1 Installations in High Humidity Environments

When the unit is installed in a hot and humid place, if the humidity inside the
installation space exceeds 86℉ and RH 80%, it is recommended to insulate the
cabinet exterior. Use glass wool or polyethylene foam as insulation; the thickness
should be more than 2 in. and it must fi t inside the installation space opening.
Condensation may come from the surface of the insulation. Be sure to use
insulation that is designed for use with HVAC Systems. Condensation may be
produced on surface during cooling operation. It is also recommended to use
auxiliary drain pan and secure the unit fi rmly to prevent it from falling. See Figures
3, 4, 5, & 6.
  R efer to local code requirements for usage of auxiliary drain pans.
Auxiliary drain pan
Figure 3
Installed Vertical Upfl ow
Installation Instructions
Drain piping
02.2019 | Bosch Thermotechnology Corp.