Page 1
Nuclear Grade IEEE Class 1E TR-LCD2300W Industrial Wide-Screen LCD Monitor with AC/DC Power Supply USER MANUAL Version 1.0 09/28/15 Transduction Inc. 23-5155 Spectrum Way, Mississauga, ON Canada L4W 5A1 Tel: 1-800-268-0427, 905-625-1907 Fax: 905-625-0531 Email: sales@transduction.com...
Page 2
Revision Description Date Initial Release 09/28/2015 TR-LCD2300W User Manual...
Introduction Description of the TR-LCD2300W Computer Monitor TR-LCD2300W monitor has been designed specifically for the stringent requirements of the reliability and safety in nuclear power plants. The design of this monitor is compliant with US Atomic Energy Commission Class 1E equipment standard that defines characteristics of equipment needed for the monitoring of the nuclear reactor and emergency shutdown procedures.
Page 5
TR-LCD2300W Front TR-LCD2300W Rear TR-LCD2300W User Manual...
Page 6
TR-LCD2300W Rear (With Optional VESA Bracket) TR-LCD2300W Door Mount TR-LCD2300W User Manual...
80% minimum at full load Power Consumption 24W max. Dimensions 21.300” (L) x 12.600” (H) x 2.630” (W) 54.10cm (L) x 32.00cm (H) x 6.68cm (W) Weight Power Supply 1.2 lbs (0.55kg) 11.02 lbs (5kg) With VESA Bracket 12.12 lbs (5.5kg) TR-LCD2300W User Manual...
Page 8
Note#1: This monitor meets all requirements of IEEE Class 1E equipment to be used in nuclear power plants. Qualification reports are available on request. Note# 2 – Safety: This monitor includes video controller card that is not software programmable and not accessible via any connection to the monitor. TR-LCD2300W User Manual...
MIL-STD-461E – Testing per EPRI TR-102323 Rev. 3 Test Plan for Important to Power CE101 – Low Frequency Conducted Emissions (DC: 30Hz – 10kHz, AC: 120Hz – 10kHz) RE101 – Low Frequency Radiated Emissions (30Hz – 100kHz) TR-LCD2300W User Manual...
Seismic Compliant as per IEEE 344+975 IEEE Recommended Practices for Seismic Qualification of Class 1E Equipment for Nuclear Generating Stations. Detailed report and video of the seismic test are available on request. Seismic Certificate TR-LCD2300W User Manual...
Products returned for repair must be accompanied by a Return Material Authorization (RMA) number, obtained from Transduction prior to return. Freight on all returned items must be prepaid by the customer. The customer is responsible for any loss or damage caused by the carrier in transit.
• Do not place the monitor face down. The CDT surface may be damaged. • When cleaning, wipe with slightly moistened soft cloth. Do not spray any cleaner directly on the monitor. • Do not remove housing. No serviceable parts inside. Refer servicing to Transduction. TR-LCD2300W User Manual...
Contents Your new TR-LCD2300W monitor box should contain the following: 1. TR-LCD2300W monitor with AC/DC power supply 2. AC power cord, 6 feet 3. SVGA cable, 6 feet 4. DVI cable, 10 feet 5. User manual and driver installation CD **Remember to save your original box and packaging material to transport or ship monitor.
**Warning: Never attach monitor to computer with the power ON as it might damage video port. To attach the TR-LCD2300W monitor to your computer, follow the instructions below: 1. Turn OFF the power to your computer. 2. Plug the power cord for the monitor into nearby outlet.
5 seconds to perform “Auto-Configuration” function When the OSD menu is ON, selects highlighted icon that user wants RIGHT Increases the adjustment of the selected function LEFT Decreases the adjustment of the selected function ON/OFF Turns ON/OFF the monitor TR-LCD2300W User Manual...
S2 and then S3 or S4 to adjust the brightness level. If setting is finished, press S1 back to Brightness sub-item and press S1 again back to Image menu. New OSD parameters are saved in NVRAM after pressing S1. TR-LCD2300W User Manual...
Need help?
Do you have a question about the TR-LCD2300W and is the answer not in the manual?
Questions and answers