Upgrading - Huawei SUN2000 Series User Manual

Hide thumbs Also See for SUN2000 Series:
Table of Contents

Advertisement

SUN2000-(90KTL-100KTL) Series
User Manual

7.1.4 Upgrading

Context
Upgrade delay is mainly used in the upgrade scenarios where the PV power supply is
disconnected at night due to no sunlight or unstable at dawn or dusk due to poor sunlight.
After the SUN2000 upgrade starts, if Upgrade delay is set to Enable, the upgrade package is
loaded first. After the PV power supply recovers and the activation conditions are met, the
SUN2000 automatically activates the upgrade.
Table 7-4 Conditions for starting delayed activation
Upgrade Method
Local upgrade over a USB
flash drive
Local upgrade of the SUN2000
APP
Remote upgrade over the
SmartLogger
Remote upgrade over the NMS
Procedure
Step 1 Log in to
Product Support tab page. Download the required upgrade package (for example,
SUN2000HA V200R001C00SPCXXX) from the Software tab page.
Step 2 Decompress the upgrade package.
After obtaining the upgrade package SUN2000HAV200R001C00SPCXXX_package.zip,
decompress it and ensure that the extracted files include:
Upgrade delay is set to Enable by default, which means that the upgrade can take place at day or night.
After enabling Upgrade delay, start the SUN2000 upgrade over a USB flash drive, SmartLogger, or
NMS. The SUN2000 upgrade process contains the following two stages:
1. The monitoring component caches and loads the upgrade package.
2. Upgrade package activation starts when the following conditions are met.
When upgrading the SUN2000 remotely, do not perform local operations for the SUN2000.
http://support.huawei.com/carrier/
config.txt
config_arm9.txt
sun_lmt_mgr_cmd.emap (This is a boot script file.)
SUN2000.bin
SUN2000_CPLD.bin
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Activation Start Condition
The CAN communication is normal.
The PV power supply is normal.
The activation starts when either of the preceding two
conditions is met.
The PV input voltage is greater than 500 V.
The output power is greater than 1 kW.
The activation starts when either of the preceding two
conditions is met.
and browse or search for SUN2000 on the
7 Man-Machine Interactions
69

Advertisement

Table of Contents
loading

Table of Contents