Download Print this page

Control Station - Econex AR2 Series Installation And Operating Instructions Manual

Electric rotary gear motor

Advertisement

6.

CONTROL STATION

For the AR2 gear motors equipped with control station proceed as follows.
6.1
Connect phase L1 to terminal n. 4.
6.2
Position the switch AUTO/MAN on manual position shown by hand picture
6.3
Switch on / switch off as follows:
6.3.1
By positioning the switch on the symbol: ▲ (open) the square shaft rotates
counter clockwise ↺ and the motor opens (cam S2 adjusts end position "open");
6.3.2
By positioning the switch on the symbol: ▼ (closed) the square shaft rotates
clockwise ↻ and the motor closes (cam S1 adjusts end position "closed").
6.3.3
By positioning the switch in the middle the motor does not run.
Picture n. 4
7 of 8

Hide quick links:

Advertisement

loading