Feedback Potentiometer/S; Control Station - Econex AB1 SE Series Installation And Operating Instructions Manual

Electronic rotary gear motor
Table of Contents

Advertisement

7

FEEDBACK POTENTIOMETER/S

On request, the AB1...SE gear motor can be supplied with 1 independent potentiometer
[pot. B] for answer signal of the position of the gear motor.
Resistance value of the potentiometer is indicated on the identification plate.
If resistance value does not correspond to the one wished, proceed as indicated in
paragraph 9.2 of § 9 ADJUSTMENTS.
Power consumption is 2 W.
8

CONTROL STATION

Local control station allows the manual rotation of the gear
8.1
motor.
AB1...SE is normally set on AUTOMATIC operation. When the gear motor is powered, a
8.2
green led light between the two push bottons, flashes four times repetadly.
To
select
MANUAL
8.3
simultaneously for at least three seconds . On MANUAL
operation , a red light will remain on .
8.4 Pushing the key ▼ gear motor will rotate counter clockwise ↺ ( cam S2 control the final
opening position).
8.5 Pushing the key ▲ gear motor will rotate clockwise ↻ ( cam S1 control the final closing
position).
8.6 Once setting operation is complete, push both buttons simultaneously for at least three
seconds to return to automatic operation. On AUTOMATIC operation the green light will
flash permanently.
8.7 Each time AB1...SE is turned off, it will restart always on AUTOMATIC way .
AB1...SE instructions
Form 140516
operation,
push
both
keys
6 of 12

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ab1 se5Ab1 se2Ab1 se4

Table of Contents