INSTALLATION
Unpacking and Inspection
Before installation, please inspect the unit. Be sure that nothing inside the package is damaged.
You should
have received the following items inside of package:
The unit x 1
User manual x 1
Preparation
Before connecting all wirings, please take off bottom cover by removing two screws .
Mounting the Unit
Consider the following points before selecting where to install:
1.Do not mount the inverter on flammable construction materials.
2.Mount on a solid surface
3.Install this inverter at eye level in order to allow the LCD display to be read at all times.
4.For proper air circulation to dissipate heat, allow a clearance of approx. 20 cm to the side and
approx. 50 cm above and below the unit.
5.The ambient temperature should be between 0°C and 55°C to ensure optimal operation.
6.The recommended installation position is to be adhered to the wall vertically.
7.Be sure to keep other objects and surfaces as shown in the diagram to
dissipation and to have enough space for removing wires.
SUITABLE FOR MOUNTING ON CONCRETE OR OTHER NON-COMBUSTIBLE SURFACE ONLY.
Battery Connection
CAUTION: For safety operation and regulation compliance, it's requested to install a separate DC
over‐current protector or disconnect device between battery and inverter. It may not be
requested to have a disconnect device in some applications, however, it's still requested to have
over‐current protection installed. Please refer to typical amperage in below table as required fuse
or breaker size.
WARNING! All wiring must be performed by a qualified personnel.
WARNING! It's very important for system safety and efficient operation to use appropriate cable
for battery connection. To reduce risk of injury, please use the proper recommended cable as
below.