Download Print this page

SBI AC01323 Manual page 4

Faceplate backing plate, bottom faceplate backing plate, projection kit

Advertisement

Step 4 : Cast iron faceplate installation
4
3.2. Projection kit assembly (4" projection
shown)
-
Secure the side projection (G) to the top
projection (H) by the means of two bolts (K)
and two nuts (L). Repeat this procedure for
the assembly on the other side (J).
3.3. Projection kit installation
-
Align the holes inside the projection kit
assembly with the corresponding holes on
the faceplate backing plate and fasten with 6
screws (B).
Finalize the positioning of the wood insert so
that the faceplate backing plate leans
against the fireplace's front finish.
refer to the manual supplied with your
heater to install the cast iron components
(M) using screws (N) pre-installed on the
front of the firebox of the insert.
Then

Advertisement

loading

This manual is also suitable for:

Ac01332Ac01322Ac01321Ac01333