Download Print this page

SBI AC01323 Manual page 2

Faceplate backing plate, bottom faceplate backing plate, projection kit

Advertisement

Step 1: Support brackets installation
2
1.1. Position the insert in its final location in order to
measure the projection of the cast iron faceplate
from the front of the fireplace finish.
1.2. Secure the mounting brackets (C) (see DETAIL 1)
on each side and (A) (see DETAIL 2) on the top of
the convection air jacket (D) with screws (B).
The location of the predrilled holes in the
convection air jacket are to identify the following
projections:
1- The cast iron faceplate has no projection (0")
from the front of the fireplace finish.
2- The cast iron faceplate has a 2" projection
from the front of the fireplace finish.
3- The cast iron faceplate has a 4" projection
from the front of the fireplace finish.
To avoid overheating, it is not allowed to
add or change the location of the existing
holes.

Advertisement

loading

This manual is also suitable for:

Ac01332Ac01322Ac01321Ac01333